29.
Apply pipe sealant compound to male threads of fittings. Remove caps/plugs and install tube tee (52).
30.
Apply pipe sealant compound to male threads of fittings and install straight pipe to tube adapter (47) and three
pipe-to-tube elbows (46 and 45) to platform (air tank) weldment.
31.
Apply pipe sealant compound to male threads of drain cock and install drain cock (44) to platform (air tank)
weldment. Open loop clamp (43) and place loop end of lanyard for drain cock (44) into loop clamp (43).
32.
Aline and install loop clamp (43) to weld stud and secure with lockwasher (42) and nut (41).
33.
Apply pipe sealant compound to male threads of fittings. Remove caps/plugs and install two pipe-to-tube elbows
(37 and 36) and two straight pipe-to-tube adapters (35) to air pressure relay valve (38).
34.
Install air pressure relay valve (38) to platform weldment and secure with two screws (40) and locknuts (39).
4-233