TM 55-1925-282-14&P
0010 00
PREPARATION FOR SHIPMENT
The ROWPU is prepared for shipment along with the remainder of the Large Tug (LT). Complete instructions for
this preparation are contained in TB 740-97-4, Preservation of Vessels for Storage.
Table 1. ROWPU System Readings Log
ROWPU SYSTEM READINGS LOG
DATE: ____________________
Reading
System
ROWPU 1
ROWPU 2
Volts
X
X
Hz
X
X
Raw Water Temperature
X
X
X
X
X
X
Brine Valve Misalignment Switch Setting
X
X
General Service Pressure
X
X
Media Filter Inlet Pressure
X
X
Media Filter Outlet Pressure
X
X
5-Micron Filter Inlet Pressure
X
X
System Operation Pressure
X
Product Water Output Pressure
X
Brine Discharge Pressure
X
Brine Water Flow Rate
X
Product Water Flow Rate
X
Raw Water Salinity (ppm)
X
Product Water Salinity (ppm)
X
Salinity Meter Reading at System Controller (ppm)
X
END OF WORK PACKAGE
0010 00-2