TM 55-1925-284-14&P
0020 00
4. Install the pressure gauge (figure 1, item 1) into the pipe fitting (figure 1, item 2).
5. Remove the lockouts and tagouts (FM 55-502).
7. Check for leaks and proper operation. Continue to monitor the system occasionally while the system pres-
surizes. If leakage is detected, secure the system and stop the leakage.
8. Return the MSD to the desired readiness condition.
END OF WORK PACKAGE