TM 9-2320-211-10-1
f. Releasing the Load.
FRAME 1
1.
Place WINCH SHIFT control lever (1) to UNWIND position.
2.
Check that cable tensioner valve control (2) is in OFF position.
3.
Move CLUTCH CONTROL lever (3) to ENGAGE position.
4.
Let drum (4) unwind a couple of turns to put slack in winch cable (5) .
5.
Move CLUTCH CONTROL lever ( 3) to DISENGAGE position.
6.
Move WINCH SHIFT control lever (1) to NEUTRAL position.
GO TO FRAME 2
TA
053968