TM 9-2320-211-10-1
FRAME
7
Push HOIST control lever (1) away from operator a little to loosen lifting
10
sling (2) . Let lever come back to neutral. Refer to data plate ( 3).
2.
Take lifting sling (2) off of cable hook (4) and outrigger frame tube eyes (5).
GO TO FRAME 6
TA
053981
4-186