TM 9-2320-211-10-1
FRAME 3
To make block sheave and hook fast:
1.
(a) Pull HOIST control lever (1) toward operator to raise cable hook (2)
until it is about arm level.
(b) Place ring of lifting sling (3) on hook (2).
(c) Place hooks of lifting sling (3) in outrigger frame tube eyes (4).
(d) Push HOIST control lever (1) away from operator until lifting sling (3)
holds hook (2) securely.
GO TO FRAME 4
4-201