TM 9-2320-269-10
OPERATION-TURRET WINCH - CONTINUED
1.
Position the derrick leg head sheave (1) so it is directly over the payload to be lifted. You will have to rotate
and/or elevate the derrick leg to do so.
2.
Push control handle (2) down to the PAYOUT position (3), lowering the winch line (4) so it can be hooked to
the payload to be lifted.
3.
Pull control handle (2) up to the TAKE UP position (6), and carefully lift the payload.
USING THE AUGER
OPERATION
WARNING
Make sure derrick hydraulic leg is fully retracted before starting auger operation. If not
fully retracted, auger may shift and cause serious personal injury.
1.
Raise derrick leg (1) to a 450 elevation, and rotate it out over the right side of the truck so you can observe
the releasing of the auger (2).
TA 222617
2-130