TM
9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
TOW SPADE INSTALLATION/REMOVAL (CONT).
2-66.
(20) Remove 8-ft (2.5 m) chain (12) from two towing shackles (4).
(22) Push RIGHT TOW CYLINDER control lever (20) and LEFT TOW
CYLINDER control lever (21) to retract right tow cylinder (22) and left
tow cylinder (23).
(23) Remove two 16-ft (5 m) safety chains (24) from stowage.
(24) Hook one end of safety chain (24) on crosstube hook (25) with one link
showing.
2S120