TM
9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
2-66. TOW SPADE INSTALLATION/REMOVAL (CONT).
NOTE
Both right and left-side extension bars are removed the
same way.
(15) Soldier A holds extension bar (13) in place while Soldier B removes
quick pin (19) and pin (20).
(16) Thread 8-ft (2.5 m) chain (11) through flat end of extension bars (13).
2-126