TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
2-78. TOW M520 (CONT).
WARNING
Tube connectors are heavy. Do not drop or personal
injury could result.
NOTE
Both tube connectors removed same way. Left side
shown.
(25) Remove quick pins (29), pins (30), and tube connectors (31) from
crosstube (22) and lift tube (17).
(26) Install pins (30) and quick pins (29) in tube connectors (31) and stow.
(27) Use cargo tiedown strap and crane to return lift tube (17) to stowage.
(28) Install two M977 front adapters (32) on crosstube (22). Install end
caps (28) on crosstube (22), Install pins (27) and quick pins (26).
2-368