TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
(15) Set up
crane for
operation in
remote control (para 2-64).
(16) Operate remote control (10) to position power plant on supports (refer
to applicable vehicle TM for power plant supports).
(17) Remove sling (5) from power plant.
NOTE
If sling is not to be used for further operation use crane
to stow sling.
(18) Remove load hook (2) from sling (5).
2-650