TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
c. Install Power Plant.
WARNING
Wrecker must be on level ground when installing power
plant. If ground is not level wrecker can tip and damage
vehicle.
(1) See applicable vehicle TM for sling or special tool required for power
plant installation.
(2) Position wrecker as close to power plant (1) as possible.
(3) Set up
wrecker crane for
operation in
remote control (para 2-64).
(4) Operate crane and attach sling (2) to crane hook block (3).
(5) Attach sling (2) to power plant (1) (refer to applicable vehicle TM to
connect lifting sling to power plant).
2-651