TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
CAUTION
Drive wrecker forward at walking speed (less than
5 mph). If driven faster and power plant starts to
swing, equipment can be damaged.
(9) Drive vehicle forward (less than 5 mph) and transport power plant to
vehicle for installation.
CAUTION
Refer to applicable TM to prepare vehicle for power
q
plant installation to prevent equipment damage.
Do not allow power plant to swing and come in
q
contact with vehicle. Power plant or vehicle may be
damaged.
NOTE
Position wrecker for best access to install power
q
plant.
Retrieval system on wrecker may be lowered to assist
q
in getting closer to vehicle.
(10) Position rear of wrecker (7) in line with vehicle.
(11) Operate HOIST control lever (4) and raise power plant high enough to
clear vehicle for installation.
(12) Drive wrecker slowly backward as close to vehicle without making
contact to position power plant for installation.
(13) Operate HOIST control lever (4) and SWING control lever (8) to position
power plant for installation.
(15) Install power plant (refer to applicable vehicle TM).
(16) Remove sling (2) from power plant (l).
(17) Remove sling (2) from load hook (3).
2-653