TM9-2330-207-14
NOTE
The intervehicular cable must be connected to the proper receptacle.
The 12-volt receptacle is located on the left side and the 24-volt
receptacle is located on the right side of the semitrailer front cross-
member.
If the coupling operation is not completed and another attempt is
to be made, pull the towing vehicle forward carefully, but do not
exceed the limits of the air hoses and electrical cables.
(5) Check the air lines and electrical cables to be sure that they are supported and will not catch or
chafe.
(6) Recheck the fifth wheel/kingpin locking by trying to move the truck tractor and semitrailer
forward.
e. Raising the Landing Gear.
(1) Unhook the crank (1) from the stow
bracket (2).
Raise the crank (1).
(2)
Turn the crank (1) counterclockwise until
(3)
the legs (3) have been retracted.
Lower the crank (1) and secure with the
(4)
stow bracket (2).
Remove and stow chock blocks and chains.
(5)
Loop chains around stowage bracket.
2-35