TM 9-2330-213-14&P
4-69. 110-VOLT ELECTRICAL SYSTEM MAINTENANCE (Con't).
NOTE
that all work loads and ground wire leads are installed as tagged.
Ensure
for manufacturing wire leads can be found in Appendix G.
Instructions
1.
Install elbow (34) on floor (35) and with four screws (44), new Iockwashers (45), and nuts (46).
2.
Install three inlet wire leads (27) and ground wire lead (26) in insert (40). Install insert in insert housing
(38).
Install new gasket (41) and insert housing (38) on elbow (34) with four screws (39), new lockwashers
3.
(42), and nuts (43).
4.
Install conduit (37) on elbow (34) with connector (36).
5.
Position box (8) on wall (12) alining hole in box with conduit (37). Install two flatwashers (22) and screws
(21).
Install conduit (37) on box (8) with connector (28)
6.
TA505347
4-138