TM 9-2330-227-14&P
ACTION
ITEM
REMARKS
LOCATION
INSTALLATION - CONTINUED
Two adapters (2)
a. Wrap threads clockwise two
turns with teflon tape.
b. Screw in, and tighten using 9/16-inch
box-end wrench.
Nut (5)
Screw in, and tighten using 7/8-inch
16. Air line (3)
open-end box wrench and 11/16-inch
and adapter (4)
open-end wrench.
Nut (8)
Screw in, and tighten using 5/8-inch
17. Air line (6)
open-end box wrench and 1/2-inch open-
and elbow (7)
end wrench.
Two nuts (10)
Screw in, and tighten using 5/8-inch
18. Two air lines (9)
and adapters (2)
open-end box wrench and 9/16-inch open-
end wrench.