TM 9-2330-227-14&P
SUBFRAME AND SUSPENSION ASSEMBLY (BOGIE) - CONTINUED
ACTION
ITEM
LOCATION
REMARKS
INSTALLATION - CONTINUED
14.
Semitrailer
Remove dolly jacks, blocks, and overhead
hoist.
NOTE
FOLLOW-ON MAINTENANCE:
TASK ENDS HERE
This task covers:
Materials/Parts
Tools
Solvent, drycleaning (item 18,
Brush, wire
Hammer, hand, ball-peen, 2-lb
Personnel Required
Jack, dolly, hydraulic, 8-ton
capacity, (two required)
Two
Socket, 3/4-inch drive,
17/16-inch
Equipment Condition
Trestle, motor vehicle,
8-ton capacity (two required)
Backing plates removed from both
Hydraulic tubes and fittings removed
5-36