TM 9-2330-227-14&P
LANDING GEAR AND BRACKET - CONTINUED
ACTION
ITEM
REMARKS
LOCATION
REMOVAL - CONTINUED
b. Take brace (3) out.
2. Continued
c. Repeat for left brace.
Using blocks and two hand hydraulic
Landing gear
3.
jacks, support landing gear assembly (6).
assembly (6)
18 screws (7)
Using 3/4-inch socket, ratchet handle
4. Landing gear
and nuts (8)
with 1/2-inch drive, and 3/4-inch
assembly (6)
wrench, unscrew and take off.
With assistant holding landing gear
Landing gear
a.
5. Frame mounting
steady, lower hydraulic jacks.
assembly (6)
brackets (9)
b. Lay landing gear on dolly jack.
c. Pull out from under semitrailer.
Eight screws (10)
6. Two frame
handle with 3/4-inch drive, unscrew
mounting
and take off.
brackets (9)
Frame mounting
Take off.
7. C r o s s -
brackets (9)
members (11)
Brace (12)
Using acetylene torch, cut off from both
8. Landing gear
landing gear assemblies (6).
assembly (6)
5-53