Section XIII. PAINTING AND IDENTIFICATION MARKING
4-65.
PAINTING AND IDENTIFICATION MARKING.
a.
For information on painting and stenciling, refer to TM 43-0139.
b.
For information on camouflage painting, refer to FM 5-20.
Section XIV. PREPARATION FOR STORAGE OR SHIPMENT
Page
Paragraph Title
Number
Care of Equipment in Administrative Storage ........................................................................................................
Definition of Administrative Storage .......................................................................................................................
Exercise Schedule, Table 4-3 ................................................................................................................................
General
..................................................................................................................................
Preparation of Equipment for Administrative Storage ............................................................................................
Preparation of Equipment for Shipment .................................................................................................................
Procedures for Common Components and Miscellaneous Items ..........................................................................
Removal of Equipment from Administrative Storage .............................................................................................
4-66.
GENERAL.
a. This section contains requirements and procedures for administrative storage of equipment that is issued to
and in use by Army activities worldwide.
b. The requirements specified herein are necessary to maintain equipment in administrative storage in such a
way as to achieve the maximum readiness condition.
c. Equipment that is placed in administrative storage should be capable of being readied to perform its mission
within a 24-hour period, or as otherwise may be prescribed by the approving authority. Before equipment is placed in
administrative storage, a current preventive maintenance checks and services (PMCS) should be completed and
deficiencies corrected.
d.
Report equipment in administrative storage as prescribed for all reportable equipment
e.
Perform inspections, maintenance services, and lubrication as specified herein.
f.
Records and reports to be maintained for equipment in administrative storage are those prescribed by DA
Pam 738-750 for equipment in use.
g. A 10% variance is acceptable on time, running hours, or mileage used to determine the required
maintenance actions.
h.
Accomplishment of applicable PMCS, as mentioned throughout this section, will be on a quarterly basis.
4-67.
DEFINITION OF ADMINISTRATIVE STORAGE.
a. The placement of equipment in administrative storage can be for short periods of time when a shortage of
maintenance effort exists. Items should be ready for use within the time factors as determined by the directing authority.
During the storage period, appropriate maintenance records will be kept.