Home
Download PDF
Order CD-ROM
Order in Print
Section lll. OPERATION UNDER USUAL CONDITIONS
PREPARING SEMITRAILER FOR OPERATION
TM-9-2330-246-14 Semitrailer Van: Electronic 6-Ton 2-Wheel Manual
Page Navigation
25
26
27
28
29
30
31
32
33
34
35
TM
9-2330-246-14
2-10.
COUPLING
SEMITRAILER
TO
TOWING
VEHICLE
(Con't).
e.
Ensure
that
pressure
tank
draincock
(6)
is
closed.
Turn
on
two
towing
vehicle
air
line
shut-off
valves
to
supply
air
pressure.
f.
Remove
wheel
chocks.
g.
Raise
landing
gear
(5)
fully
before
towing
(para
2-13).
TA700148
2-11