TM 9-2330-294-14
(2) Close vent valve.
(8) Close vent valve.
(3) Place manual shutoff valve handle in "off"
(9) Open the hand control valve and adjust
position (right angle to valve body).
regulator for an inlet" pressure of 125 psi. Outlet
pressure shall equal the inlet pressure.
(4) Open hand control valve and adjust testing
regulator for an inlet pressure of 125 psi.
(10) Open vent valve and adjust pressure
regulator valve for an inlet pressure of 0 psi. Remove
(5) Using a suitable solution, check for air
leakage at outlet port. Air leakage shall not exceed a
manual shutoff valve from testing device.
1-inch diameter bubble in 6 seconds.
j. Two-Way Check Value (CPR 100241) (fig. E-7).
(6) Close hand valve and vent inlet pressure.
(1) Using suitable air lines and fittings, connect
Connect a 0- to 200-psi pressure gage to the outlet
the two-way check valve to a testing device as shown
port.
(7) Place manual shutoff valve handle in the
"ON" position (parallel to valve body).