TM 9-2330-297-14&P
PREPARATION FOR USE - CONTINUED
14 With the help of an assistant, aline second bogie (2) with back end of left and right rails (3)
15. With the help of an assistant, roll second bogie under chassis, engaging the bogie holddown clips (4) on rails (5).
16. Roll bogie forward until lockpins (6) are alined with first holes in rails.
17. Take pull handle (7) out of bottom notch and pull it up into top notch to engage lockpin (6) in hole.
NOTE
If lockpins do not engage holes, gently rock semitrailer back and forth while pulling up on pull
handle until lockpins are fully engaged
18 Using 9116-inch open-end wrench, tighten handle lock screw (8) against pull handle (7).
19. Connect service and emergency airbrake hoses (9) and (10) to quick disconnect nipples (11) and (12) Check
security of airhose connections.
2-33