TM 9-2330-297-14&P
INSPECTION DURING STORAGE - CONTINUED
Semitrailers that are to be placed in service are to be deprocessed in accordance with TM 740-90-1. Inspect and service
the semitrailer in accordance with section III (Service Upon Receipt of Materiel), page 4-5.
Repair or replace all items tagged on inspection prior to preservation.
PACKING, SHIPMENT, AND STORAGE
PREPARATION FOR SHIPMENT
Protect the semitrailer against corrosion and damage. All unpainted metal surfaces are to be protected during shipment.
Oil or grease, listed In the lubrication chart may be used for this purpose. Oil and grease are good only for a few days
and semitrailers protected with oil and grease are to be watched closely for corrosion. Select a preservative that will not
harm the surface to which it is applied. Prepare the semitrailer for shipment by processing it in accordance with TM 740-
90-1.
4-106