TM 9-2330-357-14&P
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services (PMCS) (Con't).
B-BEFORE
D-DURING
A-AFTER
W-WEEKLY
ITEM
INTERVAL
ITEM TO BE INSPECTED
NO.
Procedure: Check for and have repaired,
EQUIPMENT IS NOT
B
D
A
W
filled, or adjusted as needed.
READY/AVAILABLE IF
16
AIR RESERVOIR
a.
Pull air reservoir drain handle (12) at rear
of semitrailer to drain condensation (para
b.
Visually check air reservoir under
semitrailer for damage and/or leaking.
TA706420
2-12