TM 9-2330-357-14&P
4-48. OUTRIGGER REPLACEMENT (Con't).
8. Place wooden block (7) on walkway frame (8).
9. Attach suitable hoist to outrigger actuator (6).
10. Install outrigger actuator (6) and bearing (14) with
pin (13) and two lockpins (12).
11. Attach suitable hoist to upper outrigger leg (1).
CAUTION
Use brass drift to install pins in steps 12 and 13.
DO NOT use metal hammer directly on pins.
Failure to follow this caution could cause pins
to bend or be damaged.
12. Install upper outrigger leg (1) with pin (2), two re-
taining rings (3), pin (5), and two retaining rings (4).
NOTE
Ensure that bearing in outrigger actuator is
alined with holes In upright brace before Installing pin.
13. Install upper outrigger leg (1) to upright brace (9)
with pin (10) and two retaining rings (11).
14. Remove wooden block (7) from between outrig-
ger actuator (6) and walkway frame (8).
FOLLOW-ON TASKS:
Connect lower outrigger limit switch to semitrailer harness (para 4-25).
Connect upper outrigger limit switch to semitrailer harness (para 4-24).
Connect outrigger drive motor cable connector to semitrailer harness (para 4-49).
Cycle replaced outrigger through complete lowering and raising procedure to check operation (para 2-12).
4-102