TM 9-2330-357-14&P
5-7. AXLE REPLACEMENT (Con't).
3.
Inspect for cracks, bends, and other visible
damage.
4.
Inspect for rust or corrosion.
5.
Inspect for broken or damaged spring leaves.
c.
INSTALLATION
1.
Install axle (7) to springs (5).
2.
Install air lines from wheels to emergency relay
3.
4.
Pull or push bogie assembly (4) under rear of
semitrailer.
5.
NOTE
Two shorter bolts are placed in outside of
6.
Install bogie assembly (4) to frame with eight
Torque bolts to 600 lb.-ft. (814 N ).
m
7.
Raise rear of semitrailer with suitable lifting
device, remove jackstands, and lower
semitrailer until wheels are on ground.
FOLLOW-ON TASKS:
Connect air lines to emergency relay valve
5-20