TM9-2330-358-14&P
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services (PMCS)
B-BEFORE
D-DURING
A-AFTER
INTERVAL
EQUIPMENT IS
ITEM TO BE INSPECTED
ITEM
NOT READY/
B D A
PROCEDURES: CHECK FOR AND HAVE
NO.
AVAILABLE IF:
REPAIRED, FILLED, OR ADJUSTED AS NEEDED
NOTE
Perform Before (B) PMCS if:
Your are the assigned operator, but
a.
have not used the semitrailer since
the last inspection.
You are using the semitrailer for
b.
the first time.
NOTE
Perform the following
inspections/checks, prior to
connecting the semitrailer to
the towing vehicle.
TIRES
1
(Duals)
a. Check tire pressure (including
q
Two tires on one
spare, if applicable) when tires are
axle flat, missing
cool.
or unserviceable.
Hard Road . . . . . . . . . . . . . . 75 psi
Cross-Country . .. . . . . . . 35 psi
(Single)
One tire flat,
Mud or Sand . . . . . . . . . 35psi
missing, or
unserviceable.
b. Check tires for cuts, foreign
q
objects or unusual tread wear. Remove
any stones from between tires.
WHEELS
2
NOTE
Left wheel nuts are turned
counterclockwise to tighten and
clockwise to loosen. Right wheel
nuts are turned clockwise to
tighten and counterclockwise to
loosen.
2-11