• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4-49. Stake Retainer
SPARE TIRE CARRIER CHAIN ASSEMBLY

TM-9-2330-358-14-P Semtrailer Tactical Dual Purpose Breakbulk/Container Transporter 22-1/2 Ton M871 M871A1 Manual Page Navigation
  144    145    146    147    148  149  150    151    152    153    154  
TM9-2330-358-14&P
Removal.
a.
(1) Remove two bolts (1, fig. 4-50) and locknuts (2) from tiedown ring bracket
(3).
(2) Remove bracket (3) and tiedown ring (4).
(3) Repeat steps 1 and 2 for other tiedown rings as needed.
Figure 4-50.
Tiedown Ring
b.
Installation.
(1) Install tiedown ring (4, fig. 4-50) and bracket (3).
(2) Secure bracket (3) with two bolts (1) and locknuts (2).
(3) Repeat steps 1 and 2 for other tiedown rings as needed.
TASK ENDS HERE
4-53.
LIFTING EYES
This task covers:
Removal
Installation
INITIAL SETUP
Tools
General mechanics tool kit
4-90






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.