• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4-55. Couplings and Drive Shaft
Left Landinq Leq Installation

TM-9-2330-358-14-P Semtrailer Tactical Dual Purpose Breakbulk/Container Transporter 22-1/2 Ton M871 M871A1 Manual Page Navigation
  150    151    152    153    154  155  156    157    158    159    160  
TM9-2330-358-14&P
Drive Shaft Removal.
d.
NOTE
The washer (6) is on the M871 semitrailer only.
(1) Remove nut (5, fig. 4-55), washer (6) and bolt (7) from coupling (8).
(2) Remove drive shaft (9).
e. Right Landing Leg Removal.
NOTE
The right landing leg is the side with the gear box.
NOTE
The washers (2) are on the M871 semitrailer only.
(1) Remove four nuts (1, fig. 4-56), washers (2) and bolts (3) holding braces
(4 and 5).  Remove braces (4 and 5).
NOTE
On the M871A1 semitrailer, remove ten nuts (6) and
bolts (8).
(2) Remove eight nuts (6), washers (7) and bolts (8). Remove right landing leg
(9) .
Riqht Landing Leg Installation.
f.
NOTE
The right landing leg is the side with the gear box.
NOTE
On the M871A1 semitrailer, install ten bolts (8) and
nuts (6).
(1) Install landing (9, fig. 4-56) and secure with eight bolts (8), washers (7)
and nuts (6).  Torque nuts to 150-160 lb ft (204-218 Nm).
NOTE
On the M871A1 semitrailer, secure braces with four
bolts (3) and nuts (l).
(2) Install braces (4 and 5) and secure with four bolts (3), washers (2) and
nuts (l).  Torque nuts to 150-160 lb ft (204-218 Nm).
4-96






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.