TM9-2330-368-14 & P
e. Installation of Tubing and Fittings.
4-17. AIR LINES (cont)
(4) Cut nylon tubing to length as listed
below:
NOTE
Use anti-seize tape on all pipe threads.
Length of
Tube and Nut
Tubing
Assembly
. . . . . . . . . . . . . . . . . . . . . . 60 inches
3
(1) Install reducer (19) and relay valve (9).
. . . . . . . . . . . . . . . . . . . . . . 24 inches
4
. . . . . . . . . . . . . . . . . . . . . . 12 inches
5
(2) Install connectors (16 and 17).
. . . . . . . . . . . . . . . . . . . . . 155 inches
6
. . . . . . . . . . . . . . . . . . . . . . 98 inches
7
(3) Install elbows (13, 14, 15 and 18).
. . . . . . . . . . . . . . . . . . . . . 206 inches
8
(4) Connect tube and nut assemblies (3
(5) Place tubing nut on nylon tubing and
through 8) to relay valve (9), trailer
install compression sleeve.
valve (10), parking brake control (11)
and air tanks (12).
(6) Install tube insert in tubing so insert
bottoms out in tubing.
(5) Install wire clips (1 and 2).
(7) Place body over end of tubing and in-
sert and tighten tubing nut.
4-32