TM 9-2330-371-14&P
SERVICE UPON RECEIPT OF MATERIEL - CONTINUED
ACTION
ITEM
LOCATION
REMARKS
Coated exterior
Remove rust preventive compound with dry-
3.
parts
cleaning solvent.
Semitrailer
a.
Inspect for damage received during
4.
shipping.
b.
If damage is found, submit DD Form 6,
Package Improvement Report.
Equipment packing
a.
5.
Check against equipment to see if
slip
shipment is complete.
b.
Report all discrepancies in accordance
with instructions in DA PAM-738-750.
PRELIMINARY SERVICING AND ADJUSTMENT OF EQUIPMENT
Perform the operator and organizational preventive maintenance checks and services contained in
chapters 3 and 4.
Lubricate all points as shown in the Lubrication Chart (page 4-5) regardless of interval.
Schedule the next preventive maintenance checks and services on DD Form 314, Preventive
Maintenance Schedule and Record.
Report all deficiencies on DA Form 2407 if the deficiencies appear to involve unsatisfactory design.
Perform a break-in road test of 25 miles (40 km) at a maximum speed of 55 miles per hour
(68.5 kph).
Section V. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS
AND SERVICES (PMCS)
Page
Page
PMCS Column Description. . . . . . . . . . . . . . . . 4-11
General . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9
Special Instructions . . . . . . . . . . . . . . . . 4-10
Leakage Definitions . . . . . . . . . . . . . . 4-11
Organizational PMCS Table . . . . . . . . . . . . . . . . . 4-12
GENERAL
To make sure that your vehicle is ready for operation at all times, inspect it systematically so you can
discover any defects and have them corrected before they result in serious damage or failure. The
charts on the next few pages contain your organizational PMCS. The item numbers indicated the
sequence of minimum inspection requirements. If you're operating the vehicle and notice
something wrong that could damage the equipment if you continue operation, stop operation
immediately.