TM 9-2330-371-14&P
Section II. AXLE MAINTENANCE
Page
Page
Trunnion Cross Tube . . . . . . . . . . . . . . . . . . . . . . . . 5-11
Axles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
B o g i e Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6
AXLES
This task covers:
b. Cleaning, inspection, and repair
INITIAL SETUP
Personnel Required
Tools
Two
Brush, wire
Support stands, safety
Equipment Condition
Materials/Parts
Solvent, drycleaning PD-680 (item 16,
ACTION
ITEM
REMARKS
LOCATION
REMOVAL
NOTE
There are two axles on the semitrailer. This
procedure is for one. Repeat this procedure for the
other.
Trunnion cross
Using two support stands, support
Two spring
1.
trunnion cross tube (2).
tube (2)
assemblies (1)
Trunnion cross
2.
rods (4)
tube (2) and
axle (3)