TM 9-2330-371-14&P
DECK - CONTINUED
ACTION
ITEM
REMARKS
LOCATION
REMOVAL
10 nuts (2), lock-
Using 1/2-inch socket, extension, and
s.
Right skid
1.
handle, unscrew and take off.
washers (3), and
strip (1)
Push each bolt up so assistant can take
b.
bolts (4)
out.
Right skid strip (1)
Lift off.
Plank (5)
2.
If replacing skid strip only, go to
step 10.
Nine nuts (7), lock-
s. Using 1/2-inch socket, extension, and
Left skid
3.
washers (8), and
handle, unscrew and take off.
strip (6)
bolts (9)
b. Push each bolt up so assistant can take
out.
Left skid strip (6)
Lift off.
Plank (5)
4.
Three nuts (10),
a.
Using 1/2-inch socket, extension, and
5.
Iockwashers (11),
handle, unscrew and take off.
b. P u s h up each bolt so assistant can take
and bolts (12)
out.
INSTALLATION
New plank (5)
a.
Cut to required size using
6.
handsaw.
b.
While assistant holds in place, drill
new holes from underneath using 5/16-
inch drill, drill motor, and holes in
frame as guide.
Three nuts (10),
Screw on and tighten using 1/2-inch
New plank (5)
7.
Iockwashers (11),
socket, extension, and handle.
and bolts (12)
Left skid strip (6)
a. Cut to required length.
Plank (5)
8.
b. Mark location for boltholes using
holes in frame as guide.
c. Drill holes using 5/16-inch drill and
drill motor.
Nine nuts (7),
Screw in and tighten using 1/2-inch
Left skid
9.
Iockwashers (8),
socket, extension, and handle.
strip (6)
and bolts (9)
It may be necessary to hit bolthead
with hammer to keep bolt from
turning.