TM 9-2330-381-14
FOLLOW-ON MAINTENANCE
1.
Perform hydraulic system check/fill and refill hydraulic tank (para. 4-17).
2.
Adjust platform height through several cycles and check for proper operation (para. 2-19).
3.
4-80.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
General mechanics tool kit, item 16, appx. B
Materials/Parts
Lockwasher (4)
Preformed packing
4-395