TM 9-2330-384-14&P
Table 2-1. Operator Preventive Maintenance Checks and Services (PMCS) (Con't).
B-Before
D-During
A-After
W-Weekly
M-Monthly
ITEM TO BE INSPECTED
INTERVAL
EQUIPMENT IS
ITEM
PROCEDURE: Check for and have Repaired, Filled, or
NOT READY/
D
W
M Adjusted as required.
B
NO.
A
AVAILABLE IF:
ROADSIDE OF SEMITRAILER (Con't)
3
f. Check grounding stud (4) at cabinet for
Any damage is found
that
will
looseness or damage. Clean any paint, grease,
prevent
proper grounding of
or dirt on grounding contact surface. If loose or
semitrailer.
damaged, notify unit maintenance.
g. Check that all Basic Issue Items (BII) in T r a n s f e r h o s e r e -
that two transfer hose reducers (18) are
present.
h. Check that grounding reels (16) in cabinet Grounding reels are
damaged or missing.
are present and secured.
i. Check that emergency valve control lever Emergency valve or
(12) and vapor vent control lever (13) are v a p o r v e n t c o n t r o l
s e c u r e l y m o u n t e d t o c a b i n e t a n d a r e n o t levers damaged.
damaged.
2-12