TM 9-2330-386-14&P
2-20 PREPARATION FOR MOVEMENT (CONT) .
(8) Install cross chain (6) through brackets (7)
on bulkhead extension (5) and bulkhead
(8).
(9) Take Up slack in cross chain (6)
and secure with S-hooks (9).
c. Raising Bulkhead Extension.
( 1 ) Disconnect S- hooks (9) and
remove cross chain (6).
( 2 ) Pull two front pins (3) and
side pins (1).
2-32