TM 9-2330-386-14&P
4-48 MUD FLAPS (CONT) .
a. R e m o v a l .
(1) Remove four nuts (1),
lock washers (2), and
capscrews (3).
(2) Remove retainer (4) and
mud flap (5).
.
b. Installation.
(1)
Position mud flap (5) and
retainer (4) on frame (6)
with
holes alined.
( 2 ) Install four capscrews (3), lock
washers (2), and nuts (1).
TASK ENDS HERE
4 - 4 9 FLOOR.
This
task
covers
removal
and
installation.
INITIAL SETUP
Tools
No. 1 common tool kit
Torque-x driver bit (Appendix D)
NOTE
See Appendix G for information on board size and
configuration of floor.
a. R e m o v a l .
to be
replaced.
(1)
Measure
board
(1)
length
and
width
(2) Remove screws (2) as needed to free board (1).
(3) Pry board (1) away from crossmembers (3).
(4)
Repeat
steps
(1)
through
(3)
for
remaining
boards
needing
replacement.
4-90