Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
CARGO COVER KIT INSTALLATION/REMOVAL
INITIAL SETUP:
Maintenance Level
References
Operator
Personnel Required
Two
GENERAL
This work package provides the data and procedures for installing and removing the cargo cover kit. Items
covered include soft top kit (steel bows) installation, soft top (steel bows) installation, soft top (steel bows)
removal, and soft top kit (steel bows) removal.
SOFT TOP KIT (STEEL BOWS) INSTALLATION
1.
Lower ladder (WP 0010 00, Lower Ladder).
2.
Open stowage box door (1).
NOTE
Soft top kit is equipped with a total of 10 tubes. Five front tubes are longer than rear
tubes.
3.
Stow five front tubes (2), five rear tubes (3), and steel pole (4) in stowage box.
4.
Close stowage box door (1).
0014 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business