Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES,
0042 00
INCLUDING LUBRICATION INSTRUCTIONS - Continued
After PMCS Procedures for Trailer - Continued
Table 7. Preventive Maintenance Checks and Services (PMCS) - After.
CREWMEMBER
EQUIPMENT
ITEM
INTERVAL
MAN-
ITEM TO BE
PROCEDURE
NOT READY/
NO.
HOUR
CHECKED
AVAILABLE
OR
IF:
SERVICED
1
After
Air Tank
1. With trailer parked and towing
Air leak(s)
vehicle engine shut down, listen for
heard around
sound of air leaks around trailer air
air tank.
tank (1).
2. Open air tank drain valve (2) and
drain moisture (WP 0011 00,
Draining Air Tank).
0042 00-23


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business