Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES,
0042 00
INCLUDING LUBRICATION INSTRUCTIONS - Continued
Monthly PMCS Procedures for Trailer - Continued
Table 9. Preventive Maintenance Checks and Services (PMCS) - Monthly - Continued.
CREWMEMBER
EQUIPMENT
ITEM
INTERVAL
MAN-
ITEM TO BE
PROCEDURE
NOT
NO.
HOUR
CHECKED
READY/
OR
AVAILABLE
SERVICED
IF:
5
Monthly
0.1
Oil Can Points
Lubricate all oil can points with
OE/HDO specified for ambient
temperature. The Operator/crew is
responsible for lubricating the
following points:
OIL CAN POINTS
NUMBER
1. Tailgate hinge pins
2
2. Cargo bed side
8
panel hinge pins
3. Cargo bed tiedown
14 (LMTVT),
rings
16 (MTVT)
4. Voltage converter
1
box cover hinge pin.
5. Side panel stowage
2
box hinge pins
6. Stowage box door
1
hinge pin
OIL CAN POINTS
As Required
Expected Temperatures
Above 40
40 to -
-15 to -
F
15F
50F (-
(4 C)
(4 to
26 to -
-26 C)
46 C)
OE/HDO-
OE/HDO-
OEA
10
10
0042 00-49


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business