TM 9-2330-394-13&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES,
0042 00
INCLUDING LUBRICATION INSTRUCTIONS - Continued
Semiannual PMCS Procedures for Trailer (Field Level) - Continued
Table 10. Preventive Maintenance Checks and Services (PMCS) - Semiannual (Field Level) -
Continued.
ITEM TO BE  FIELD-LEVEL MAINTENANCE
EQUIPMENT
ITEM
INTERVAL
MAN-
CHECKED OR PROCEDURE
NOT READY/
NO.
HOUR
AVAILABLE
SERVICED
IF:
5
Semiannual
0.2 -
Spring Bolts
Check if three months have passed
LMTVT
and Spring
since spring bolts (15) and spring
Shackles,
shackles (16) have been lubricated
LMTV
(LMTVT only). If spring bolts and
spring shackles have not been
lubricated, lubricate using a low-
pressure lubricating gun until grease
appears between pins and bushings at
both ends of spring bolt and spring
shackle. If pins do not accept grease,
remove pins. Clean and inspect pins
and bushings, replace if necessary.
Spring Bolt and Spring Shackle
Interval: S
Temperatures
Above
+40F to -
-15F to -
+40F
15F
50F
(Above  (+4C to -
(-26C to -
+4C)
26C)
46C)
GAA
GAA
GAA
NOTE
If operating conditions are severe or
abnormal, service once every month.
0042 00-66


 