Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
ANTI-LOCK BRAKING SYSTEM (ABS) CONTROL POWER
HARNESS REPLACEMENT
THIS WORK PACKAGE COVERS:
Removal, Installation, Operational Check
INITIAL SETUP:
Maintenance Level
Materials/Parts (Cont)
Field
Terminal, Lug (Item 5, WP 0181 00)
Nut, Self-Locking (3) (LMTVT) (Item 37,
Tools and Special Tools
Tool Kit, Electrical Contact Repair
Nut, Self-Locking (4) (MTVT) (Item 37,
(Item 36, WP 0178 00)
Tool Kit, Genl Mech (Item 37,
Insulation Sleeving (Item 19, WP 0176 00)
Cap and Plug Set (Item 6, WP 0176 00)
Goggles, Industrial (Item 8, WP 0178 00)
Wrench, Torque, 0-300 lb-in (Item 51,
References
Towing vehicle Operator manual
Materials/Parts
Antiseize Compound (Item 3, WP 0176 00)
Ties, Cable, Plastic (Item 37, WP 0176 00)
Equipment Conditions
Trailer uncoupled (WP 0012 00).
WARNING
Wear appropriate eye protection when working under trailer due to the
possibility of falling debris. Failure to comply may result in injury to
personnel.
0068 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business