Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
LEAF SPRING (LMTVT) REPLACEMENT
THIS WORK PACKAGE COVERS:
Removal, Installation, Operational Check
INITIAL SETUP:
Maintenance Level
Materials/Parts
Field
Nut, Self-Locking (4) (Item 46, WP 0181 00)
Grease, Automotive and Artillery (GAA)
Tools and Special Tools
(Item 11, WP 0176 00)
Tool Kit, Genl Mech (Item 37,
U-Bolt (2) (item 51, WP 0181 00)
Wrench, Torque, 0-175 lb-ft (Item 49,
Personnel Required
Two
Wrench, Torque, 0-600 lb-ft (Item 52,
Equipment Conditions
Goggles, Industrial (Item 8, WP 0178 00)
Tire removed (from side being worked)
Wrench Set, Socket (Item 46, WP 0178 00)
Jack, Dolly Type, Hydraulic (2) (Item 14,
Trestles, Motor Vehicle Maintenance (2)
(Item 38, WP 0178 00)
WARNING
Wear appropriate eye protection when working under trailer due to the
possibility of falling debris. Failure to comply may result in injury to
personnel.
0100 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business