Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
CARGO BED REPLACEMENT - Continued
0103 00
INSTALLATION - Continued
NOTE
Perform Steps (19 through 23) on right side of front lifting beam.
19. Position four bolts (32) and self-locking nuts (33) in front lifting beam (3).
20. Position four bolts (34) and self-locking nuts (35) in front lifting beam (3).
21. Tighten eight self-locking nuts (33 and 35) to 210-225 lb-ft (285-305 Nm).
0103 00-16


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business