Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
SHOCK MOUNT CROSSMEMBER REPLACEMENT - Continued
0107 00
FRONT SHOCK MOUNT CROSSMEMBER INSTALLATION, MTVT - Continued
6.
Position four bolts (59) and self-locking nuts (60) on front lifting beam (9).
7.
Position seven bolts (61) and self-locking nuts (62) on front lifting beam (9).
Tighten self-locking nuts (60 and 62) to 210-225 lb-ft (285-305 Nm).
8.
9.
Perform steps (6 through 8) on left side of trailer.
0107 00-21


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business