Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
SHOCK MOUNT CROSSMEMBER REPLACEMENT - Continued
0107 00
FRONT SHOCK MOUNT CROSSMEMBER INSTALLATION, MTVT - Continued
13. Position two bolts (65) and self-locking nuts (66) on tiedown ring bracket (3).
14. Tighten two self-locking nuts (66) to 210-225 lb-ft (285-305 Nm).
15. Perform steps (13 and 14) on left side of trailer.
0107 00-23


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business