TM 9-2330-394-13&P
FRAME RAIL (LMTVT) REPLACEMENT
THIS WORK PACKAGE COVERS:
Removal, Installation, Operational Check
INITIAL SETUP:
Maintenance Level
Materials/Parts (Cont)
Field
Nuts, Self-Locking (20) (Item 35,
Tools and Special Tools
Antiseize Compound (Item 3,
Tool Kit, Genl Mech (Item 37, WP 0178 00)
Jack, Leveling Support, Vehicle (2)
(Item 15, WP 0178 00)
Personnel Required
Sling, Cargo (Item 27, WP 0178 00)
Two
Socket Set, Impact (Item 28, WP 0178 00)
Wrench Set, Socket (Item 46, WP 0178 00)
Equipment Conditions
Wrench, Torque, 0-600 lb-ft (Item 52,
Electrical cable assembly removed
Wrench, Torque, 0-300 lb-in. (Item 51,
Sub frame removed (WP 0111 00).
Tongue assembly removed
Wrench, Impact, Electric (Item 42, WP 0178 00)
Goggles, Industrial (Item 8, WP 0178 00)
Stabilizer bar removed (WP 0091 00).
Stabilizer mounting bracket
Materials/Parts
Leaf springs removed (WP 0100 00).
Bolts (8) (Item 26, WP 0181 00)
Push-pull/air supply valve removed
Bolts (12) (Item 49, WP 0181 00)
Nuts, Self-Locking (2) (Item 37,
REMOVAL
WARNING
Wear appropriate eye protection when working under trailer due to the
possibility of falling debris. Failure to comply may result in injury to
personnel.
NOTE
Left and right frame rails are removed the same way. Left frame rail shown.
0115 00-1


 