FRAME RAIL (MTVT) REPLACEMENT - Continued
0116 00
OPERATIONAL CHECK
1.
Install axle bogie shaft (WP 0121 00, Assembly).
2.
Install mechanical stop and resilient mount (WP 0076 00, Resilient Mount Installation,
Mechanical Stop Installation).
3.
Install leaf springs (WP 0099 00, Installation).
4.
Install stabilizer mounting bracket (WP 0092 00, Installation).
5.
Install V-rod control arms (WP 0098 00, Installation).
6. Install push-pull/air supply valve (WP 0062 00, Installation).
7.
Install tongue assembly (WP 0113 00, Installation).
8.
Install sub frame (WP 0110 00, Installation).
9.
Install electrical cable assembly (WP 0051 00, Installation).
10. Couple trailer (WP 0009 00, Coupling Trailer).
11. Road test trailer.