TM 9-2330-398-10
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services (PMCS) (continued)
ITEM TO
PROCEDURE
NOT FULLY
ITEM
CHECK/
MISSION[
NO.
INTERVAL
SERVICE
CAPABLE IF:
12
Before
Hose Reels
Check operation of rewind handle for front and
Either front or rear hose reel
rear hose reels
is inoperable.
13
Before
Grounding
a. Check static reel operation. Inspect for
a. Static reel is missing
Devices
missing grounding clips and loose or missing
from vehicle or is damaged.
mounting hardware.
b. Check portable grounding rod to ensure that
b. Portable grounding rod
it is not damaged or missing.
is missing from vehicle or
is damaged.
14
During
Piping
a.
a.
Any fuel leaks are present.
System
b.
Check valves P and R for proper operation.
b. Valve is hard to open or
close.
15
During
Towing
a. Connect air lines of prime mover to couplings
a.
Air leaks are present.
Connec-
on semitrailer. With prime mover engine
tions
running. check air lines and couplings for air
leaks.
b. Connect electrical line of prime mover to
b. Turn signal and stop lights
receptacle on semitrailer. Check all lights for
are not operating. Prime
damage. Check to see that all lights are
mover intervehicular cable
operating, and check tightness of connection at
is damaged (cuts, cracks,
receptacle. If tight, and lights still do not operate,
broken wires, etc.)
notify Unit maintenance. Check electrical line
for damage.
2-16