TM 9-2350-222-10-2
OPERATE BOOM (PERFORM HOISTING) - Continued
32. Install retaining pin (F) thru snatch block (D) and mount (R). Secure pin withspring clip (E).
33. Using rungs (K) as ladder, carefully climb up left side of boom (J).
34. Remove cable lifting hook (L) from retaining eye (M).
35.
Carefully lower hook (L) to ground.
36.
Carefully climb down boom (J).
37.
Return rope.
38.
TA132444
2-304